Match Charter Public School
Hyde Park, MA
Studio G completed the Feasibility Study and Design for Match Charter Public School’s new campus for 700 preK-9 English Language Learner students. It includes separate elementary and middle school buildings as well as a gym, permitted under Boston Art. 80 large project review. The 70,000 SF of the 3 buildings was designed as LEED-Silver certifiable. To enhance Match’s daily small group tutoring, Studio G designed classrooms with small meeting alcoves and tutoring booths off the hallway to maximize flexibility of teaching. Outdoor spaces include athletic fields and recreation space suited for different ages. Academic fields were a hybrid of site and modular construction to meet the school’s budget and schedule. The project was completed in Summer 2015.